EarthQuake W2808 Instrukcje Operacyjne

Przeglądaj online lub pobierz Instrukcje Operacyjne dla Łuparki drewna EarthQuake W2808. EarthQuake W2808 Operating instructions Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 16
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Includes Models
W2265 & W2808
Vertical / Horizontal
LOG SPLITTER
Assembly & Operating Instructions
OM-WS2265-04 Rev-030904
© Copyright 2004 Ardisam, Inc.
All Rights Reserved. Printed in USA.
Przeglądanie stron 0
1 2 3 4 5 6 ... 15 16

Podsumowanie treści

Strona 1 - LOG SPLITTER

Includes ModelsW2265 & W2808Vertical / HorizontalLOG SPLITTERAssembly & Operating InstructionsOM-WS2265-04 Rev-030904© Copyright 2004 Ardisam,

Strona 2 - WARRANTY

Page 10LOG SPLITTER OPERATING INSTRUCTIONSIMPORTANT: The engine and hydraulic reservoir are shipped without oil. See the Engine Operator’sManual pack

Strona 3 - SAFETY AND MAINTENANCE

Page 11LOG SPLITTER OPERATING INSTRUCTIONS1. The log splitter is equipped with high speed road tires, a Class II coupler (1-7/8” diameter ball requir

Strona 4

Page 12LOG SPLITTER OPERATING INSTRUCTIONS1. Consult the operating and maintenance instructions of the Engine Operator’s Manual for engine care andmai

Strona 5 - SAFETY DECALS

Page 13LOG SPLITTER NOTES_____________________________________________________________________________________________________________________________

Strona 6

Page 146.5-HP LOG SPLITTER PARTS EXPLOSION4121 4113 4100 4113 4341 43434331 4314 4363 (2)4117 (2)433743284362 41254101 43314117 4353 431443633305 4352

Strona 7

Page 15Part No. Description Qty.60G56 Locknut, Bi-way, 5/16 8509 Bolt, Slotted HWH, 1/4-20 x 1/2 6535 Key, 1/4 x 1, 8-hp 1800 Engine-Tecumseh, 8-h

Strona 8 - Figure 5

Page 16LOG SPLITTER SPECIFICATIONSArdisam, Inc. 1690 Elm Street, Cumberland, Wisconsin 54829(715)822-2415 • Fax (715)822-4180 www.ardisam.comMAXIMUM

Strona 9 - Figure 7

Page 2One Year Limited WarrantyThe Ardisam, Inc., Manufacturing Company warrants this Earthquake® Log Splitter to be free fromdefects in material or w

Strona 10

Page 3SAFETY AND MAINTENANCEBefore operating this log splitter, carefullyread this manual and follow all instructions.• Do not allow anyone to operate

Strona 11

Page 4• Do not operate your log splitter in poor mechanicalcondition or when in need of repair.• Periodically check that all nuts, bolts, and screwsar

Strona 12 - Figure 9

Page 5SAFETY DECALSPart Number: LBL4178Description: All General Warnings DecalLocation: Back of Hydraulic ReservoirPart Number: LBL4179Description: To

Strona 13 - LOG SPLITTER NOTES

Page 6WARNING: BEFORE OPERATING YOUR LOG SPLITTER, PLEASE FULLY READ ANDUNDERSTAND ALL SAFETY, MAINTENANCE, AND ASSEMBLY INSTRUCTIONS OUTLINED INTHIS

Strona 14

Page 74. Attach the wheels to each side of the reservoir(4300) by sliding the end of the spindle into the tubesat the bottom of the reservoir. Make su

Strona 15

Page 8MODEL W2265 ONLY8. Remove the 90 degree street elbow (4122) and the1” barbed coupler (4160) and insert the streetelbow first into the suction sc

Strona 16 - LOG SPLITTER SPECIFICATIONS

Page 9LOG SPLITTER ASSEMBLY INSTRUCTIONSNOTE: At least two people are required to lift andassemble the beam to the reservoir.12. Remove the beam and s

Komentarze do niniejszej Instrukcji

Brak uwag